 
   
             
        SCB
                    Société des Ciments du Bénin
                
                        
        31.10.2025
                SCB
Société des Ciments du Bénin is a crushing unit, with its own laboratory that allows to garantee high level of cement. The packing unit is the last step in the production line, where cement is packed in bags. Cement is made from a mix of clinker, lime and gypsum in defined quantities.
How could you splice your belts easier and faster?
            Customer issue
With the last splicing method, downtime was 36 hours and needed 4 splicers.
MLT answer
With SUPER-SCREW®*, the lifetime of this new splice is between 3 and 6 years. Dedicated human resources are now 2 people. The maximum time to install the splice is one hour.
Technical specifications:
- Belt: EP500/4 AA
- Belt length: 207m
- Belt width: 800mm
- Product: lime and clinker
*Registered trademark, all rights reserved
2
            
    people to install the splice
            
    Subtitle
                                    Star product
                            SUPER‑SCREW®* Original
Description
                                    MLT is the inventor of the world’s first flexible screw splice, created in 1994: the SUPER-SCREW®* Original. Since then, this endless system has proven its worth all over the world by offering a simple and quick installation in any situation.
Button text
                                     
Do you have
a specific
request?
            
    
a specific
request?
        MLT Minet Lacing Technology SAS
        
        ZI du Clos Marquet, 3 Rue Michel Rondet        
        CS 70059,        42400
        Saint-Chamond, France        
    
 
 
 
        